welcome art
homespacer staff mailspacerstudent mail spacersfespacercontactspacerstaff loginspacerTrustees
banner artbanner art
schoolsparents and communitystudentsprogramsboard and budgetcareersdepartment and servicesnewsbanner
   
Building Department Building homeEngineering group Operations group Technical support groupOrganization Chart Frequently asked questions5 year planECOVEST Computerized Maintenance Management (CMMS) - SchoolDude
art

Building Department

The Building Department is responsible for coordinating the physical environment with the people and the work of the Division.  Under the general direction of the Chief Superintendent, the Building Department delivers infrastructure needs of the Division in consultation with senior administration, school administrators and community advisory groups. The physical plant of the Division includes 95 buildings with approximately 5,130,000 square feet of space of varying vintages and 300 acres of grounds. The Department recognizes the importance of retaining the building heritage while accommodating the needs of all stakeholders and incorporating contemporary building codes and educational requirements.

The Building Department includes the following groups:

Engineering Group

The Engineering Group provides the following professional services:       

  • Planning
  • Architectural Design
  • Mechanical Engineering Design
  • Electrical Engineering Design
  • Drafting             
  • Construction Management

Operations Group

The Operations Group provides daily building maintenance, grounds maintenance and minor construction projects to division buildings and grounds. Operations Group includes:       

  • Mechanical Maintenance    
  • Electrical Maintenance
  • Interior Finishes
  • Infrastructure Maintenance
  • The custodial services are school based.

Technical Support Group

The Technical Support Group provides professional consulting services to both the Engineering and Operations Groups. This group includes:

  • Project and Maintenance Estimation
  • Planned and Preventive Maintenance Programs
  • Energy Management Services

Administrative Support Group

The Administrative Support Group is a team that provides the senior administration in the Building Department financial and administrative support. This group includes:

  • Office Manager
  • Administrative Assistant
  • Clerical Support

Funding

Building projects within the division may be funded by internal and capital funds or by the Province of Manitoba Public School Finance Board. All projects are administrated under the general direction of the Board of Trustees.

 

Building Department

Winnipeg School Division

Building Department

1395 Spruce Street

Winnipeg, MB. R3E 2V9

Ph: (204) 786-0344

Fax: (204) 774-6406

Email: buildingdepartment@wsd1.org

 

 
© Winnipeg School Division
1577 Wall Street East
Winnipeg, Mb R3E 2S5 Canada
Phone 204-775-0231, Fax 204-772-6464
back to top